Scientia Iranica

Scientia Iranica

Author = Fariborz Jolai
Number of Articles: 13

A novel mathematical model to minimize the total cost of the hospital and COVID-19 outbreak concerning waiting time of patients using Jackson queueing networks, a case study

Articles in Press, Accepted Manuscript, Available Online from 13 February 2023

10.24200/sci.2023.60803.6999

Shirin Ghasemi, Fateme Taghipour, Amir Aghsami, Fariborz Jolai, Soroush Jolai

Time-dependent sustainable vehicle routing problem in city logistics

Articles in Press, Accepted Manuscript, Available Online from 23 June 2024

10.24200/sci.2024.60734.6963

Mehrdad Mirzabaghi, Fariborz Jolai, Jafar Razmi, Reza Tavakkoli-Moghaddam

Launch strategies for newly developed short life cycle products

Volume 31, Issue 22, November and December 2024, Pages 2071-2087

10.24200/sci.2022.55619.4311

Fariborz Jolai, Alireza Taheri-Moghadam, Jafar Razmi, Ata Allah Taleizadeh

Bundle pricing, reservation, and refund policies in a two-level supply chain

Volume 29, Issue 5, September and October 2022, Pages 2740-2755

10.24200/sci.2021.55228.4121

M. Moeany, A. A. Taleizadeh, F. Jolai

A novel fuzzy bi-objective vehicle routing and scheduling problem with time window constraint for a distribution system: A case study

Volume 28, Issue 5, September and October 2021, Pages 2868-2889

10.24200/sci.2020.52461.2727

A. Esmaeilidouki, M. Mahzouni-Sani, A. Nikhalat Jahromi, F. Jolai

Integrated Forward-reverse Logistics Network Design under Uncertainty and Reliability Consideration

Volume 23, Issue 2, April 2016, Pages 721-735

10.24200/sci.2016.3858

S. M. Hatefi, F. Jolai, S.A. Torabi, R. Tavakkoli-Moghaddam

An Evolutionary Algorithm for Supplier Order Allocation with Fuzzy Parameters Considering Linear and Volume Discount

Volume 22, Issue 3, June 2015, Pages 1130-1141

Mahsa Soufi Neyestani, Fariborz Jolai, Hamid Reza Golmakani

An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem

Volume 21, Issue 3, June 2014, Pages 1007-1020

Fariborz Jolai, Reza Tavakkoli-Moghaddam, M. Rabiee, E. Gheisariha

Consideration of transportation lags in Two-machine Flowshop scheduling problem

Volume 20, Issue 6, December 2013, Pages 2215-2223

Fariborz Jolai, Hamid Abedinnia

Three meta-heuristics to solve the no-wait two-stage assembly flow shop scheduling problem

Volume 20, Issue 6, December 2013, Pages 2275-2283

A. Mozdgir, S.M.T. Fatemi Ghomi, F. Jolai, J. Navaei