A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework

Document Type : Research Note

Authors

1 College of Business, Chung Yuan Christian University, Chung Li, Taiwan, R. O. C.

2 Department of International Business Management, Shih Chien University, Taipei, Taiwan, R. O. C

3 School of Engineering and Sciences, Tecnológico de Monterrey. Ave. Eugenio Garza Sada 2501 Sur, C.P. 64849, Monterrey, Nuevo León, México

Abstract

Recently, an alternative multi-delivery policy into imperfect economic production quantity (EPQ) inventory model with partial rework has been proposed, which considers the number of shipments a fixed and given value. This paper, treating the long-run average costs per unit time as a function of the replenishment lot size  and the number of shipments , adopts the differential calculus approach to get the optimal solution of  and  jointly. In numerical examples, it is illustrated that the solution procedure is simple and accurate.
 

Keywords

Main Subjects


Volume 24, Issue 5
Transactions on Industrial Engineering (E)
September and October 2017
Pages 2640-2644
  • Receive Date: 16 January 2015
  • Revise Date: 12 July 2016
  • Accept Date: 24 September 2016