Recently, an alternative multi-delivery policy into imperfect economic production quantity (EPQ) inventory model with partial rework has been proposed, which considers the number of shipments a fixed and given value. This paper, treating the long-run average costs per unit time as a function of the replenishment lot size and the number of shipments , adopts the differential calculus approach to get the optimal solution of and jointly. In numerical examples, it is illustrated that the solution procedure is simple and accurate.
Chung,K , Ting,P and Cárdenas-Barrón,L E . (2017). A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework. Scientia Iranica, 24(5), 2640-2644. doi: 10.24200/sci.2017.4484
MLA
Chung,K , , Ting,P , and Cárdenas-Barrón,L E . "A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework", Scientia Iranica, 24, 5, 2017, 2640-2644. doi: 10.24200/sci.2017.4484
HARVARD
Chung K, Ting P, Cárdenas-Barrón L E. (2017). 'A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework', Scientia Iranica, 24(5), pp. 2640-2644. doi: 10.24200/sci.2017.4484
CHICAGO
K Chung, P Ting and L E Cárdenas-Barrón, "A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework," Scientia Iranica, 24 5 (2017): 2640-2644, doi: 10.24200/sci.2017.4484
VANCOUVER
Chung K, Ting P, Cárdenas-Barrón L E. A simple solution procedure to solve the multi-delivery policy into economic production lot size problem with partial rework. Scientia Iranica. 2017;24(5):2640-2644. doi: 10.24200/sci.2017.4484