Product acceptance determination based on EWMA yield index using repetitive and MDS sampling schemes

Document Type : Article

Authors

1 Department of Statistics, Faculty of Science, King Abdulaziz University, Jeddah 21551, Saudi Arabia

2 Department of Statistics and Computer Sciences, University of Veterinary and Animals Sciences, Lahore 54000, Pakistan

3 College of Statistical and Actuarial Sciences, University of the Punjab, Lahore, Pakistan

4 Department of Industrial Engineering and Management Information, Huafan University, Taipei, Taiwan

5 Department of Industrial and Management Engineering, POSTECH, Pohang 37673, Republic of Korea

Abstract

In this manuscript, we present a repetitive group sampling plan and a multiple dependent state sampling plan based on the EWMA (exponentially weighted moving average) yield index for product acceptance. The proposed plans utilize the current and the previous information through EWMA statistic to reach a decision of lot sentencing. A non-linear optimization model is developed to determine the plan parameters of the proposed plans for various specified conditions. The performance of the proposed plans over several existing sampling plans is analyzed, which shows that the proposed plans are efficient in reducing the sample size for lot sentencing. For industrial application, a real example is given to demonstrate the implementation of the proposed plans.

Keywords


References:
1. Collani, E.V. "A note on acceptance sampling for variables", Metrika, 38(1), pp. 19-36 (1991).
2. Seidel, W. "Is sampling by variables worse than sampling by attributes? A decision theoretic analysis and a new mixed strategy for inspecting individual lots", Sankhya: The Indian Journal of Statistics, Series B, pp. 96-107 (1997).
3. Govindaraju, K. and Balamurali, S. "Chain sampling plan for variables inspection", Journal of Applied Statistics, 25(1), pp. 103-109 (1998).
4. Cassady, C.R. and Nachlas, J.A. "Evaluating and implementing 3-level acceptance sampling plans", Quality Engineering, 15(3), pp. 361-369 (2003).
5. Lin, H.C. and Sheen, G.J. "Practical implementation of the capability index C pk based on the control chart data", Quality Engineering, 17(3), pp. 371-390 (2005).
6. Gao, Y. and Tang, L.C. "Chain sampling scheme under constant inspection errors", Quality and Reliability Engineering International, 22(8), pp. 889-903 (2006).
7. Pearn, W.L. andWu, C.W. "Critical acceptance values and sample sizes of a variables sampling plan for very low fraction of defectives", Omega, 34(1), pp. 90-101 (2006).
8. Balamurali, S. and Jun, C.H. "Repetitive group sampling procedure for variables inspection", Journal of Applied Statistics, 33(3), pp. 327-338 (2006).
9. Wu, C.W. and Pearn, W.L. "A variables sampling plan based on Cpmk for product acceptance determination", European Journal of Operational Research, 184(2), pp. 549-560 (2008).
10. Balamurali, S. and Jun, C.H. "Multiple dependent state sampling plans for lot acceptance based on measurement data", European Journal of Operational Research, 180(3), pp. 1221-1230 (2007).
11. Morita, M., Arizono, I., Nakase, I., et al. "Economical operation of the C pm control chart for monitoring process capability index", The International Journal of Advanced Manufacturing Technology, 43(3-4), pp. 304-311 (2009).
12. Tsai, T.R. and Lin, C.W. "Acceptance sampling plans under progressive interval censoring with likelihood ratio", Statistical Papers, 51(2), pp. 259-271 (2010).
13. Klufa, J. "Exact calculation of the Dodge-Romig LTPD single sampling plans for inspection by variables", Statistical Papers, 51(2), pp. 297-305 (2010).
14. Vangjeli, E. "ASN-minimax double sampling plans by variables for two-sided specification limits when the standard deviation is known", Statistical Papers, 53(1), pp. 229-238 (2012).
15. Aslam, M., Jun, C.H., and Rasool, M. "Regular papers: A reliability sampling plan based on progressive interval censoring under Pareto distribution of second kind", IEMS, 10(2), pp. 154-160 (2011).
16. Aslam, M., Balamurali, S., Jun, C.H., et al. "Optimal designing of an SkSP-V skip-lot sampling plan with double-sampling plan as the reference plan", The International Journal of Advanced Manufacturing Technology, 60(5-8), pp. 733-740 (2012).
17. Wang, C.H. and Tsai, W. "Determining the production lot size with a heuristic inspection policy for controlling the quality of input materials and products", International Journal of Systems Science, 43(11), pp. 2030- 2039 (2012).
18. Wu, C.W., Aslam, M., and Jun, C.H. "Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk", European Journal of Operational Research, 217(3), pp. 560-566 (2012).
19. Aslam, M., Lio, Y., and Jun, C.H. "Repetitive acceptance sampling plans for Burr type XII percentiles", The International Journal of Advanced Manufacturing Technology, 68(1-4), pp. 495-507 (2013).
20. Nezhad, M.S.F. and Nasab, H.H. "Designing a single stage acceptance sampling plan based on the control threshold policy", International Journal of Industrial Engineering, 22(3), pp. 143-150 (2011).
21. Aslam, M., Yen, C.H., and Jun, C.H. "Variable repetitive group sampling plans with process loss consideration", Journal of Statistical Computation and Simulation, 81(11), pp. 1417-1432 (2011).
22. Negrin, I., Parmet, Y., and Schechtman, E. "Developing a sampling plan based on Cpk-unknown variance", Quality and Reliability Engineering International, 27(1), pp. 3-14 (2011).
23. Wu, C.W., Liao, M.Y., and Chen, J.C. "An improved approach for constructing lower confidence bound on process yield", European Journal of Industrial Engineering, 6(3), pp. 369-390 (2012).
24. Yen, C.H., Chang, C.H., and Aslam, M. "Repetitive variable acceptance sampling plan for one-sided specification", Journal of Statistical Computation and Simulation, 85(6), pp. 1102-1116 (2015).
25. Aslam, M., Azam, M., and Jun, C.H. "Multiple dependent state sampling plan based on process capability index'', Journal of Testing and Evaluation, 41(2), pp. 340-346 (2013).
26. Liu, S.W. and Wu, C.W. "Design and construction of a variables repetitive group sampling plan for unilateral specification limit", Communications in Statistics-Simulation and Computation, 43(8), pp. 1866-1878 (2014).
27. Aslam, M., Yen, C.H., Chang, C.H., et al. "Multiple dependent state variable sampling plans with process loss consideration", The International Journal of Advanced Manufacturing Technology, 71(5-8), pp. 1337- 1343 (2014).
28. Montgomery, D.C., Introduction to Statistical Quality Control, John Wiley & Sons (2007).
29. Cisar, P. and Cisar, S.M. "Optimization methods of EWMA statistics", Acta Polytechnica Hungarica, 8(5), pp. 73-87 (2011).
30. Aslam, M., Azam, M., and Jun, C.H. "A new lot inspection procedure based on exponentially weighted moving average", International Journal of Systems Science, pp. 1-9 (2013)(ahead-of-print).
31. Yen, C.H., Aslam, M., and Jun, C.H. "A lot inspection sampling plan based on EWMA yield index", The International Journal of Advanced Manufacturing Technology, pp. 1-8 (2014).
32. Sherman, R.E. "Design and evaluation of a repetitive group sampling plan", Technometrics, 7(1), pp. 11-21 (1965).
33. Wortham, A. and Baker, R. "Multiple deferred state sampling inspection", The International Journal of Production Research, 14(6), pp. 719-731 (1976).
34. Aslam, M., Wu, C.W., Jun, C.H., et al. "Developing a variables repetitive group sampling plan based on process capability index C pk with unknown mean and variance", Journal of Statistical Computation and Simulation, 83(8), pp. 1507-1517 (2013).
35. Yen, C.H. and Chang, C.H. "Designing variables sampling plans with process loss consideration", Communications in Statistics-Simulation and Computation, 38(8), pp. 1579-1591 (2009).
36. Boyles, R.A. "Brocess capability with asymmetric tolerances", Communications in Statistics-Simulation and Computation, 23(3), pp. 615-635 (1994).
37. Lee, J.C., Hung, H.N., Pearn, W.L., et al. "On the distribution of the estimated process yield index Spk", Quality and Reliability Engineering International, 18(2), pp. 111-116 (2002).
38. Aslam, M., Wu, C.W., Azam, M., et al. "Variable sampling inspection for resubmitted lots based on process capability index Cpk for normally distributed items", Applied Mathematical Modelling, 37(3), pp. 667-675 (2013).
39. Aslam, M., Khan, N., Azam, M., et al. "Designing of a new monitoring t-chart using repetitive sampling", Information Sciences, 269, pp. 210-216 (2014).
40. Aslam, M., Yen, C.H., Chang, C.H., et al. "Two-stage variables acceptance sampling plans using process loss functions", Communications in Statistics-Theory and Methods, 41(20), pp. 3633-3647 (2012).
Volume 29, Issue 4
Transactions on Industrial Engineering (E)
July and August 2022
Pages 2241-2251
  • Receive Date: 19 February 2020
  • Revise Date: 30 July 2020
  • Accept Date: 03 January 2022