A sustainable production-inventory model joint with preventive maintenance and multiple shipments for imperfect quality items

Document Type : Article

Authors

1 Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran

2 Department of Industrial Engineering, Faculty of Engineering, University of Kashan, Kashan, Iran

Abstract

The quality of products, maintenance operations, and transportation policies are primary concerns of managers in inventory and production planning issues. Besides that, environmental concerns and regulations are growing increasingly and attracted much attention to green production concepts such as sustainable production. Previous authors conducted a wide range of research on these problems separately. Regarding the gap of an integrated framework, we formulate a sustainable Economic Production Quantity model by considering preventive maintenance and multiple shipments of items where a portion of produced items are defective. Two different Cases are studied. In Case I, we assumed that the demand in the production period is satisfied by the produced items in the previous cycle. In another state and in Case II, simultaneous production and consumption during the production period is considered and mathematically formulated. An analytical method is presented for solving the models, and a numerical example is discussed for both Cases. Moreover, sensitivity analysis of the models is carried out, and some managerial insight is derived by changing some of the critical parameters of models. Finally, we present some directions for feature researches.

Keywords


References:
1. Harris, F.W. "How many parts to make at once", The Magazine of Management, 38(6), pp. 947-950 (1990).
2. Taft, E. "The most economical production lot", Iron Age, 101(18), pp. 1410-1412 (1918).
3. Tiwari, S., Daryanto, Y., and Wee, H.M. "Sustainable  inventory management with deteriorating and imperfect quality items considering carbon emission", Journal of Cleaner Production, 192, pp. 281-292 (2018).
4. Mokhtari, H., Naimi-Sadigh, A., and Salmasnia, A. "A computational approach to economic production quantity model for perishable products with backordering shortage and  tock-dependent demand", Scientia Iranica. Transaction E, Industrial Engineering, 24(4), pp. 2138-2151 (2017).
5. Hemmati, M., Fatemi Ghomi, S., and Sajadieh, M.S. "Inventory of complementary products with stockdependent demand under vendor-managed inventory with consignment policy", Scientia Iranica, 25(4), pp. 2347-2360 (2018).
6. Mokhtari, H. and Asadkhani, J. "Economic order quantity for imperfect quality items under inspection errors, batch replacement and multiple sales of returned items", Scientia Iranica, 28(5), pp. 2890-2909 (2022).
7. Mokhtari, H. and Fallahi, A. "The economic production quantity model considering production quantity (EPQ) model considering inflation, time value of money and investment variable in production capacity", Sharif Journal of Industrial Engineering & Management, 35.1(2.2), pp. 53-67 (2020). DOI: 10.24200/j65.2019.51273.1902.
8. Mokhtari, H. "Joint ordering and reuse policy for reusable items inventory management", Sustainable Production and Consumption, 15, pp. 163-172 (2018).
9. Hua, G., Cheng, T., and Wang, S. "Managing carbon footprints in inventory management", International Journal of Production  Economics, 132(2), pp. 178-185 (2011).
10. Bouchery, Y., Ghaffari, A., Jemai, Z., et al. "Including sustainability criteria into inventory models", European Journal of Operational Research, 222(2), pp. 229-240 (2012).
11. Chen, X., Benjaafar, S., and Elomri, A. "The carbon-constrained EOQ", Operations Research Letters, 41(2), pp. 172-179 (2013).
12. Battini, D., Persona, A., and Sgarbossa, F. "A sustainable EOQ model: Theoretical formulation and applications", International Journal of Production Economics, 149, pp. 145-153 (2014).
13. Hovelaque, V. and Bironneau, L. "The carbonconstrained EOQ model with carbon emission dependent demand", International Journal of Production Economics, 164, pp. 285-291 (2015).
14. Zhang, Y., Li, L.-Y., Tian, X.-Q., et al. "Inventory management research for growing items with carbonconstrained", in 2016 35th Chinese Control Conference (CCC), IEEE, pp. 9588-9593 (2016).
15. Kazemi, N., Abdul-Rashid, S.H., Ghazilla, R.A.R., et al. "Economic order quantity models for items with imperfect quality and emission considerations", International Journal of Systems Science: Operations & Logistics, 5(2), pp. 99-115 (2018).
16. Taleizadeh, A.A., Soleymanfar, V.R., and Govindan, K. "Sustainable economic production quantity models for inventory systems with shortage", Journal of Cleaner Production, 174, pp. 1011-1020 (2018).
17. Lee, J.-Y. "Investing in carbon emissions reduction in the EOQ model", Journal of the Operational Research Society, 71(8), pp. 1289-1300 (2020).
18. Mishra, U., Wu, J.-Z., Tsao, Y.-C., et al. "Sustainable inventory system with controllable non-instantaneous deterioration and environmental emission rates", Journal of Cleaner Production, 244, 118807 (2020).
19. Salameh, M. and Jaber, M. "Economic production quantity model for items with imperfect quality", International Journal of Production Economics, 64(1- 3), pp. 59-64 (2000).
20. Chang, H.-C. "An application of fuzzy sets theory to the EOQ model with imperfect quality items", Computers & Operations Research, 31(12), pp. 2079- 2092 (2004).
21. Rezaei, J. "Economic order quantity model with backorder for imperfect quality items", In Proceedings. 2005 IEEE International Engineering Management Conference, 2, IEEE, pp. 466-470 (2005).
22. Lo, S.-T., Wee, H.-M., and Huang, W.-C. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation", International Journal of Production Economics, 106(1), pp. 248-260 (2007).
23. Chung, K.-J., Her, C.-C., and Lin, S.-D. "A twowarehouse inventory model with imperfect quality production processes", Computers & Industrial Engineering, 56(1), pp. 193-197 (2009).
24. Sarkar, B. and Moon, I. "An EPQ model with inflation in an imperfect production system", Applied Mathematics and Computation, 217(13), pp. 6159- 6167 (2011).
25. Konstantaras, I., Skouri, K., and Jaber, M. "Inventory models for imperfect quality items with shortages and learning in inspection", Applied Mathematical Modelling, 36(11), pp. 5334-5343 (2012).
26. Wee, H.-M., Wang, W.-T., and Yang, P.-C. "A production quantity model for imperfect quality items with shortage and screening constraint", International Journal of Production Research, 51(6), pp. 1869-1884 (2013).
27. Chang, C.-T., Cheng, M.-C., and Soong, P.-Y. "Impacts of inspection errors and trade credits on the economic order quantity model for items with imperfect quality", International Journal of Systems Science: Operations & Logistics, 3(1), pp. 34-48 (2016).
28. Mokhtari, H. "Optimal lot size in a manufacturing system with imperfect raw materials and defective finished products", Scientia Iranica, 26(4), pp. 2561- 2578 (2019).
29. Khakzad, A. and Gholamian, M.R. "The effect of inspection on deterioration rate: An inventory model for deteriorating items with advanced payment", Journal of Cleaner Production, 254, 120117 (2020).
30. Dhaka, V., Pareek, S., and Mittal, M. "Stockdependent inventory model for imperfect items under permissible delay in payments", In Optimization and Inventory Management, Springer, pp. 181-194 (2020).
31. Chiu, Y.-S.P., Liu, S.-C., Chiu, C.-L., et al. "Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments", Mathematical and Computer Modelling, 54(9-10), pp. 2165-2174 (2011).
32. CaRdenas-BarroN, L.E., Taleizadeh, A.A., and TrevinO-Garza, G. "An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework", Expert Systems with Applications, 39(18), pp. 13540-13546 (2012).
33. Ritha, W. and Martin, N. "Replenishment policy for EMQ model with rework, multiple shipments, switching and packaging", Int. J. Eng. Res. Technol, 2(1), pp. 1-8 (2013).
34. Taleizadeh, A.A., Kalantari, S.S., and Cardenas- Barron, L.E. "Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments", Journal of Industrial and Management Optimization, 11(4), pp. 1059-1071 (2015).
35. Taleizadeh, A.A., Kalantari, S.S., and Cardenas- Barron, L.E. "Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments", Top, 24(1), pp. 143-155 (2016).
36. Priyan, S. and Uthayakumar, R. "Setup cost reduction EMQ inventory system with probabilistic defective and rework in multiple shipments management", International Journal of System Assurance Engineering and Management, 8(2), pp. 223-241 (2017).
37. Kalantari, S.S. and Taleizadeh, A.A. "Mathematical modelling for determining the replenishment policy for deteriorating items in an EPQ model with multiple shipments", International Journal of Systems Science: Operations & Logistics, 7(2), pp. 164-171 (2020).
38. Rezg, N., Dellagi, S., and Chelbi, A. "Joint optimal inventory control and preventive maintenance policy", International Journal of Production Research, 46(19), pp. 5349-5365 (2008).
39. Liao, G.-L., Chen, Y.H., and Sheu, S.-H. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance", European Journal of Operational Research, 195(2), pp. 348-357 (2009).
40. Widyadana, G.A. and Wee, H.M. "Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time", Applied Mathematical Modelling, 35(7), pp. 3495-3508 (2011).
41. Wee, H.M. and Widyadana, G.A. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule", Omega, 41(6), pp. 941-954 (2013).
42. Liao, G.-L. "Production and maintenance policies for an epq model with perfect repair, rework, free-repair warranty, and preventive maintenance", IEEE Transactions on Systems, Man, and Cybernetics: Systems, 46(8), pp. 1129-1139 (2015).
43. Jafari, L. and Makis, V. "Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring", International Journal of Production Economics, 169, pp. 156-168 (2015).
44. Peng, H. and van Houtum, G.-J. "Joint optimization of condition-based maintenance and production lotsizing", European Journal of Operational Research, 253(1), pp. 94-107 (2016).
45. Nasr, W.W., Salameh, M., and Moussawi-Haidar, L. "Economic production quantity with maintenance interruptions under random and correlated yields", International Journal of Production Research, 55(16), pp. 4544-4556 (2017).
46. Taleizadeh, A.A. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering", Annals of Operations Research, 261(1-2), pp. 303-337 (2018).
47. Lai, X., Chen, Z., and Bidanda, B. "Optimal decision of an economic production quantity model for imperfect manufacturing under hybrid maintenance policy with shortages and partial backlogging", International Journal of Production Research, 57(19), pp. 6061-6085 (2019).
48. Tsao, Y.-C., Lee, P.-L., Liao, L.-W., et al. "Imperfect economic production quantity models under predictive maintenance and reworking", International Journal of Systems Science: Operations & Logistics, 7(4), pp. 347-360 (2019).
49. Mokhtari, H. and Asadkhani, J. "Extended economic production quantity models with preventive maintenance", Scientia Iranica, 27(6), pp. 3253-3264 (2020).
Volume 30, Issue 3
Transactions on Industrial Engineering (E)
May and June 2023
Pages 1204-1223
  • Receive Date: 09 May 2020
  • Revise Date: 11 January 2021
  • Accept Date: 15 March 2021