Keywords = heuristic algorithm
A two-stage heuristic algorithm for dynamic seru scheduling problems with resource constraints

Articles in Press, Accepted Manuscript, Available Online from 27 November 2024

10.24200/sci.2024.62411.7826

Yiran Xiang; Zhe Zhang; Xiaoling Song; Xue Gong; Yong Yin


A three-stage optimization model for scheduling facility maintenance considering random failure rates

Volume 30, Issue 5, September and October 2023, Pages 1898-1909

10.24200/sci.2021.57722.5386

F. Zagia; O. Motamedi Sedeh; B. Ostadi


Consideration of transportation lags in Two-machine Flowshop scheduling problem

Volume 20, Issue 6, December 2013, Pages 2215-2223

Fariborz Jolai; Hamid Abedinnia