References
1. Harris, F.W. \How many parts to make at once",
Factory, The Magazine of Management, 10(2), pp.
135-136, and 152 (1913).
2. Taft, E.W. \The most economical production lot",
Iron Age, 101(18), pp. 1410-1412 (1918).
3. Pacheco-Velazquez, E.A., and Cardenas-Barron, L.E.
\An economic production quantity inventory model
with backorders considering the raw material costs",
Scientia Iranica E, 23(2), pp. 736-746 (2016).
4. Eilon, S. \Scheduling for batch production", Journal
of Institute of Production Engineering, 36, pp. 549-570
and 582 (1957).
5. Rogers, J.A. \Computational approach to the economic
lot scheduling problem", Management Science,
4(3), pp. 264-291 (1958).
A.H. Nobil et al./Scientia Iranica, Transactions E: Industrial Engineering 25 (2018) 2331{2346 2343
6. Bomberger, E.E. \A dynamic programming approach
to a lot size scheduling problem", Management Science,
12(11), pp. 778-784 (1966).
7. Madigan, J.G. \Scheduling a multi-product single
machine system for an innite planning period", Management
Science, 14(11), pp. 713-719 (1968).
8. Stankard, M.F. and Gupta, S.K. \A note on
Bomberger's approach to lot size scheduling: Heuristic
proposed", Management Science, 15(7), pp. 449-452
(1969).
9. Hodgson, T.J. \Addendum to Stankard and Gupta's
note on lot size scheduling", Management Science,
16(7), pp. 514-517 (1970).
10. Baker, K.R. \On Madigan's Approach to the deterministic
multi-product production and inventory
problem", Management Science, 16(9), pp. 636-638
(1970).
11. Taleizadeh, A.A.,Wee, H.M., and Sadjadi, S.J. \Multiproduct
production quantity model with repair failure
and partial backordering", Computers and Industrial
Engineering, 59(1), pp. 45-54 (2010).
12. Taleizadeh, A.A., Niaki, S.T.A., and Naja, A.A.
\Multiproduct single-machine production system with
stochastic scrapped production rate, partial backordering
and service level constraint", Journal of Computational
and Applied Mathematics, 233(8), pp. 1834-
1849 (2010).
13. Taleizadeh, A.A., Sadjadi, S.J., and Niaki, S.T.A.
\Multiproduct EPQ model with single machine, backordering
and immediate rework process", European
Journal of Industrial Engineering, 5(4), pp. 388-
411(2011).
14. Taleizadeh, A.A,. Shavandi, H., and Haji, R. \Constrained
single period problem under demand uncertainty",
Scientia Iranica E, 18(6), pp. 1553-1563
(2011).
15. Taleizadeh, A.A., Cardenas-Barron, L.E., Biabani, J.,
and Nikousokhan, R. \Multi products single machine
EPQ model with immediate rework process", International
Journal of Industrial Engineering Computations,
3(2), pp. 93-102 (2012).
16. Ramezanian, R. and Saidi-Mehrabad, M. \Multiproduct
unrelated parallel machines scheduling problem
with rework processes", Scientia Iranica E, 19(6),
pp. 1887-1893 (2012).
17. Neidigh, R.O. and Harrison, T.P. \Optimising lot
sizing with nonlinear production rates in a multiproduct
single-machine environment", International
Journal of Production Research, 51(12), pp. 3561-3573
(2013).
18. Taleizadeh, A.A., Wee, H.M., and Jalali-Naini, S.G.
\Economic production quantity model with repair
failure and limited capacity", Applied Mathematical
Modelling, 37(5), pp. 2765-2774 (2013a).
19. Taleizadeh, A.A., Jalali-Naini, S.G., Wee, H.M., and
Kuo, T.C. \An imperfect multi-product production
system with rework", Scientia Iranica E, 20(3), pp.
811-823 (2013b).
20. Taleizadeh, A.A., Cardenas-Barron, L.E., and Mohammadi,
B.A. \deterministic multi product single
machine EPQ model with backordering, scraped products,
rework and interruption in manufacturing process",
International Journal of Production Economics,
150, pp. 9-27 (2014).
21. Wu, M.F. and Sung, P.C. \Optimization of a multiproduct
EPQ model with scrap and an improved multidelivery
policy", Journal of Engineering Research,
2(4), pp. 1-16 (2014).
22. Pasandideh, S.H.R., Niaki, S.T.A., Nobil, A.H., and
Cardenas-Barron, L.E. \A multiproduct single machine
economic production quantity model for an
imperfect production system under warehouse construction
cost", International Journal of Production
Economics, 169, pp. 203-214 (2015).
23. Chiu, S.W., Sung, P.C., Tseng, C.T., and Chiu,
Y.S.P. \Multi-product FPR model with rework and
multi-shipment policy resolved by algebraic approach",
Journal of Scientic and Industrial Research, 74(10),
pp. 555-559 (2015).
24. Shaee-Gol, S., Nasiri, M.M., and Taleizadeh, A.A.
\Pricing and production decisions in multi-product
single machine manufacturing system with discrete
delivery and rework", OPSEARCH, 53(4), pp. 873-888
(2016).
25. Vahdania, M., Dolatib, A., and Bashiria, M. \Singleitem
lot-sizing and scheduling problem with deteriorating
inventory and multiple warehouses", Scientia
Iranica E, 20(6), pp. 2177-2187 (2013).
26. Pasandideh, S.H.R., Niaki, S.T.A., and Sharafzadeh,
S. \Optimizing a bi-objective multi-product EPQ
model with defective items, rework and limited orders:
NSGA-II and MOPSO algorithms", Journal of Manufacturing
Systems, 32(4), pp. 764-770 (2013).
27. Forouzanfar, F., Tavakkoli-Moghaddam, R., Bashiri,
M., and Baboli, A. \A new bi-objective model for a
closed-loop supply chain problem with inventory and
transportation times", Scientia Iranica E, 23(3), pp.
1441-1458 (2016).
28. Mahmoodirad, A. and Sanei, M. \Solving a multi-stage
multi-product solid supply chain network design problem
by meta-heuristics", Scientia Iranica E, 23(3), pp.
1428-1440 (2016).
29. Neidigh, R.O. and Harrison, T.P. \Optimising lot sizing
with nonlinear production rates in a multi-product
multi-machine environment", International Journal of
Production Research, 57(4), pp. 939-959 (2017).
30. Sarkar, B. and Saren, S. \Product inspection policy for
an imperfect production system with inspection errors
and warranty cost", European Journal of Operational
Research, 248(1), pp. 263-271 (2016).
31. Kang, C.W., Ullah, M., Sarkar, B., Hussain,
I., and Akhtar, R. \Impact of random defective
rate on lot size focusing work-in-process inventory
in manufacturing system", International Jour2344
A.H. Nobil et al./Scientia Iranica, Transactions E: Industrial Engineering 25 (2018) 2331{2346
nal of Production Research, pp. 1-19 (2016). DOI
http://dx.doi.org/10.1080/00207543.2016.1235295.
32. Tayyab, M. and Sarkar, B. \Optimal batch quantity
in a cleaner multi-stage lean production system with
random defective rate", Journal of Cleaner Production,
139, pp. 922-934 (2016).
33. Jaggi, C.K., Tiwari, S., and Goel, S.K. \Credit nancing
in economic ordering policies for non-instantaneous
deteriorating items with price dependent demand and
two storage facilities", Annals of Operations Research,
248(1) pp. 253-280 (2017).
34. Jaggi, C.K., Tiwari, S., and Goel, S.K. \Replenishment
policy for non-instantaneous deteriorating items in a
two storage facilities under in
ationary conditions",
International Journal of Industrial Engineering Computations,
7(3), pp. 489-506 (2016).
35. Nobil, A.H., Sedigh, A.H.A., and Cardenas-Barron,
L.E. \A multi-machine multi-product EPQ problem
for an imperfect manufacturing system considering
utilization and allocation decisions", Expert Systems
with Applications, 56, pp. 310-319 (2016).