References
1. Gong, G.L., Chiong, R., Deng, Q.W., et al. “A memetic algorithm for multi-objective distributed production scheduling: minimizing the makespan and total energy consumption”, Journal of Intelligent Manufacturing, 31, pp. 1443-1466 (2020). https://doi.org/10.1007/s10845-019-01521-9
2. Tan, M., Chen, Y., Su, Y.X., et al. “Integrated optimization model for industrial self-generation and load scheduling with tradable carbon emission permits”, Journal of Cleaner Production, 210, pp. 1289-1300 (2019). https://doi.org/10.1016/j.jclepro.2018.11.005
3. Kannan, G., Haq, A.N. and Devika, M. “Analysis of closed loop supply chain using genetic algorithm and particle swarm optimisation”, International Journal of Production Research, 47(5), pp. 1175-1200 (2009). https://doi.org/10.1080/00207540701543585
4. Cao, Y.R., Liu, J., Yu, Y., et al. “Impact of environmental regulation on green growth in China's manufacturing industry-based on the Malmquist-Luenberger index and the system GMM model”, Environmental Science and Pollution Research, 27(33), pp. 41928-41945 (2020). https://doi.org/10.1007/s11356-020-10046-1
5. Meng, K., Qian, X.M., Lou, P.H., et al. “Smart recovery decision-making of used industrial equipment for sustainable manufacturing: belt lifter case study”, Journal of Intelligent Manufacturing, 31(1), pp. 183-197 (2020). https://doi.org/10.1007/s10845-018-1439-2
6. Efficiency, E. “Tracking industrial energy efficiency and CO2 emissions”, International Energy Agency, 34(2), pp. 1-12 (2007). http://www.iea.org/w/bookshop/add.aspx?id=298
7. Far, M.H., Haleh, H. and Saghaei, A. “A flexible cell scheduling problem with automated guided vehicles and robots under energy-conscious policy”, Scientia Iranica, 25(1), pp. 339-358 (2018). https://doi.org/10.24200/sci.2017.4399
8. Xiong, G., Wang, F.Y., Nyberg, T.R., et al. “From mind to products: Towards social manufacturing and service”, IEEE-CAA Journal of Automatica Sinica, 5(1), pp. 47-57 (2018). https://doi.org/10.1109/JAS.2017.7510742
9. Tian, G.D., Zhang, H.H., Feng, Y.X., et al. “Green decoration materials selection under interior environment characteristics: A grey-correlation based hybrid MCDM method”, Renewable & Sustainable Energy Review, 81(1), pp. 682-692 (2018). https://doi.org/10.1016/j.rser.2017.08.050
10. Cao, Y.R., Liu, J., Yu, Y., et al. “Impact of environmental regulation on green growth in China's manufacturing industry-based on the Malmquist-Luenberger index and the system GMM model”, Environmental Science and Pollution Research, 27(33), pp. 41928-41945 (2020). https://doi.org/10.1007/s11356-020-10046-1
11. Li, Y.B., Huang, W.X., Wu, R., et al. “An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem”, Applied Soft Computing, 95, 106544 (2020). https://doi.org/10.1016/j.asoc.2020.106544
12. Gholami, H.R., Mehdizadeh, E. and Naderi, B. “Mathematical models and an elephant herding optimization for multiprocessor-task flexible flow shop scheduling problems in the Manufacturing Resource Planning (MRPII) system”, Scientia Iranica, 27(3), pp. 1562-1571 (2020). https://doi.org/10.24200/sci.2018.5552.1343
13. Fu, Y.P., Tian, G.D., Fathollahi-Fard, A.M., et al. “Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint”, Journal of Cleaner Production, 226, pp. 515-525 (2019). https://doi.org/10.1016/j.jclepro.2019.04.046
14. Chen, J., Wang, M.L., Kong, X.T.T., et al. “Manufacturing synchronization in a hybrid flow shop with dynamic order arrivals”, Journal of Intelligent Manufacturing, 30(7), pp. 2659-2668 (2019). https://doi.org/10.1007/s10845-017-1295-5
15. Fonseca, G.B., Nogueira, T.H. and Ravetti, M.G. “A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem”, European Journal of Operational Research, 275(1), pp. 139-154 (2019). https://doi.org/10.1016/j.ejor.2018.11.033
16. Fu, Y.P., Zhou, M.C., Guo, X.W., et al. “Scheduling dual-objective stochastic hybrid flow shop with deteriorating jobs via bi-population evolutionary algorithm”, IEEE Transactions on Systems Man Cybernetics-Systems, 50(12), pp. 5037-5048 (2020). https://doi.org/10.1109/TSMC.2019.2907575
17. Li, Y.L., Li, X.Y., Gao, L., et al. “An improved artificial bee colony algorithm for distributed heterogeneous hybrid flow shop scheduling problem with sequence-dependent setup times”, Computers & Industrial Engineering, 147, 106638 (2020). https://doi.org/10.1016/j.cie.2020.106638
18. Guo, J., Shi, Y.Y., Chen, Z., et al. “Improved SP-MCTS-based scheduling for multi-constraint hybrid flow shop”, Applied Sciences, 10(18), 6220 (2020). https://doi.org/10.3390/app10186220
19. Tian, G.D., Zhang, H.H., Feng, Y.X., et al. “Operation patterns analysis of automotive components remanufacturing industry development in China”, Journal of Cleaner Production, 164, pp. 1363-1375 (2017). https://doi.org/10.1016/j.jclepro.2017.07.028
20. Chen, T.L., Cheng, C.Y. and Chou, Y.H. “Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming”, Annals of Operations Research, 290, pp. 813-836 (2020). https://doi.org/10.1007/s10479-018-2969-x
21. Liu, Z.F., Yan, J., Cheng, Q., et al. “The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling”, Journal of Cleaner Production, 246, 119071 (2020). https://doi.org/10.1016/j.jclepro.2019.119071
22. Hasani, A. and Hosseini, S.M.H. “A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: Trade-off between production costs and energy consumption”, Applied Mathematics and Computation, 386, 125533 (2020). https://doi.org/10.1016/j.amc.2020.125533
23. Li, M., Lei, D.M. and Cai, J.C. “Two-level imperialist competitive algorithm for energy-efficient hybrid flow shop scheduling problem with relative importance of objectives”, Swarm and Evolutionary Computation, 49, pp. 34-43 (2019). https://doi.org/10.1016/j.swevo.2019.05.006
24. Zheng, X., Zhou, S.C., Xu, R., et al. “Energy-efficient scheduling for multi-objective two-stage flow shop using a hybrid ant colony optimisation algorithm”, International Journal of Production Research, 58(12), pp. 4103-4120 (2019). https://doi.org/10.1080/00207543.2019.1642529
25. Schulz, S., Neufeld, J.S. and Buscher, U. “A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling”, Journal of Cleaner Production, 224, pp. 421-434 (2019). https://doi.org/10.1016/j.jclepro.2019.03.155
26. Meng, L.L., Zhang, C.Y., Shao, X.Y., et al. “More MILP models for hybrid flow shop scheduling problem and its extended problems”, International Journal of Production Research, 58(13), pp. 3905-3930 (2020). https://doi.org/10.1080/00207543.2019.1636324
27. Tian, G.D., Zhou, M.C. and Li, P.G. “Disassembly sequence planning considering fuzzy component quality and varying operational cost”, IEEE Transactions on Automation Science and Engineering, 15(2), pp. 748-760 (2018). https://doi.org/10.1109/TASE.2017.2690802
28. Tian, G.D., Ren, Y.P., Feng, Y.X., et al. “Modeling and planning for dual-objective selective disassembly using AND/OR graph and discrete artificial bee colony”, IEEE Transactions on Industrial Informatics, 15(4), pp. 2456-2468 (2019). https://doi.org/10.1109/TII.2018.2884845
29. Wang, W.J., Tian, G.D., Chen, M.N., et al. “Dual-objective program and improved artificial bee colony for the optimization of energy-conscious milling parameters subject to multiple constraints”, Journal of Cleaner Production, 245, 118714 (2020). https://doi.org/10.1016/j.jclepro.2019.118714
30. Ding, J.W., Schulz, S., Shen, L.J., et al. “Energy-aware scheduling in flexible flow shops with hybrid particle swarm optimization”, Computers & Operations Research, 125, 105088 (2021). https://doi.org/10.1016/j.cor.2020.105088
31. Dai, M., Tang, D.B., Zheng, K, et al. “An improved genetic-simulated annealing algorithm based on a hormone modulation mechanism for a flexible flow-shop scheduling problem”, Advances in Mechanical Engineering, 124903 (2013). https://doi.org/10.1155/2013/124903
32. Rao, R.V., Savsani, V.J. and Vakharia, D.P. “Teaching-learning-based optimization: A novel method for constrained mechanical design optimization problems”, Computer-Aided Design, 43(3), pp. 303-315 (2010). https://doi.org/10.1016/j.cad.2010.12.015
33. Zhou, Y.K. and Zheng, S.Q. “Climate adaptive optimal design of an aerogel glazing system with the integration of a heuristicteaching-learning-based algorithm in machine learning-based optimization”, Renewable Energy, 153, pp. 375-391 (2020). https://doi.org/10.1016/j.renene.2020.01.133
34. Garcia, J.A.M. and Mena, A.J.G. “Optimal distributed generation location and size using a modified teaching-learning based optimization algorithm”, International Journal of Electrical Power & Energy Systems, 50, pp. 65-75 (2013). https://doi.org/10.1016/j.ijepes.2013.02.023
35. Sahu, B.K., Pati, S., Mohanty, P.K., et al. “Teaching-learning based optimization based fuzzy-PID controller for automatic generation control of multi- area power system”, Applied Soft Computing, 27, pp. 240-249 (2015). https://doi.org/10.1016/j.asoc.2014.11.027
36. Lei, D.M., Su, B. and Li, M. “Cooperated teaching-learning-based optimisation for distributed two-stage assembly flow shopscheduling”, International Journal of Production Research, 59(23), pp. 7232-7245 (2020). https://doi.org/10.1080/00207543.2020.1836422
37. Shao, W.S., Pi, D.C. and Shao, Z.S. “An extended teaching-learning based optimization algorithm for solving no-wait flow shop scheduling problem”, Applied Soft Computing, 61, pp. 193-210 (2017). https://doi.org/10.1016/j.asoc.2017.08.020
38. Zhang, M., Wu, K.H. and Hu, Y.M. “Improved teaching-learning-based optimization algorithm for solving job shop scheduling problem”, Control and Decision, 32(2), pp. 349-357 (2017). https://doi.org/10.13195/j.kzyjc.2016.0035
39. Boudjelida, A. “On the robustness of joint production and maintenance scheduling in presence of uncertainties”, Journal of Intelligent Manufacturing, 30(4), pp. 1515-1530 (2019). https://doi.org/10.1007/s10845-017-1303-9
40. Lin, W.W., Tian, G.D., Li, Z.W., et al. “Flow shop scheduling with low carbon emission and variable machining parameters”, Proceedings of the Institution of Mechanical Engineers Part B: Journal of Engineering Manufacture, 233(5), pp. 1561-1572 (2019). https://doi.org/10.1177/0954405418782290
41. Enayatifar, R., Yousefi, M., Abdullah, A.H., et al. “MOICA: A novel multi-objective approach based on imperialist competitive algorithm”, Applied Mathematics and Computation, 219(17), pp. 8829-8841 (2013). https://doi.org/10.1016/j.amc.2013.03.099
42. Deb, K., Pratap, A., Agarwal, S., et al. “A fast and elitist multi objective genetic algorithm: NSGA-II”, IEEE Transactions on Evolutionary Computation, 6(2), pp. 182-197 (2002). https://doi.org/10.1109/4235.996017
43. Li, D.S., Zhang, C.Y., Tian, G.D., et al. “Multiobjective program and hybrid imperialist competitive algorithm for the mixed-model two-sided assembly lines subject to multiple constraints”, IEEE Transactions on Systems Man Cybernetics-Systems, 48(1), pp. 119-129 (2018). https://doi.org/10.1109/TSMC.2016.2598685
44. Li, D.S., Zhang, C.Y., Shao, X.Y., et al. “A multi-objective TLBO algorithm for balancing two-sided assembly line with multiple constraints”, Journal of Intelligent Manufacturing, 27(4), pp. 725-739 (2016). https://doi.org/10.1007/s10845-014-0919-2
45. Wang, W.J., Tian, G.D., Yuan, G., et al. “Energy-time tradeoffs for remanufacturing system scheduling using an invasive weed optimization algorithm”, Journal of Intelligent Manufacturing, 34, pp. 1065-1083 (2023). https://doi.org/10.1007/s10845-021-01837-5
46. Lei, D.M., Gao, L. and Zheng, Y. L. “A novel teaching-learning-based optimization algorithm for energy-efficient scheduling in hybrid flow shop”, IEEE Transactions on Engineering Management, 65(2), pp. 330-340 (2018). https://doi.org/10.1109/TEM.2017.2774281
47. Zhang, Q.F. and Li, H. “MOEA/D: A multiobjective evolutionary algorithm based on decomposition”, IEEE Transactions on Evolutionary Computation, 11(6), pp. 712-731 (2007). https://doi.org/10.1109/TEVC.2007.892759
48. Li, X.Y., Lu, C., Gao, L., et al. “An effective multiobjective algorithm for energy-efficient scheduling in a real-life welding shop”, IEEE Transactions on Industrial Informatics, 14(12), pp. 5400-5409 (2018). https://doi.org/10.1109/TII.2018.2843441
49. Auger, A., Bader, J., Brockhoff, D., et al. “Articulating user preferences in many-objective problems by sampling the weighted hypervolume”, in Proceedings of the 11th Annual Conference on Genetic and Evolutionary Computation, ACM, pp. 555-562 (2009). https://doi.org/10.1145/1569901.1569979
50. Wang, W.J., Tian, G.D., Zhang, T.Z., et al. “Scheme selection of design for disassembly (DFD) based on sustainability: A novel hybrid of interval 2-tuple linguistic intuitionistic fuzzy numbers and regret theory”, Journal of Cleaner Production, 281, 124724 (2021). https://doi.org/10.1016/j.jclepro.2020.124724
51. Tian, G.D., Hao, N.N., Zhou, M.C., et al. “Fuzzy grey choquet integral for evaluation of multicriteria decision making problems with interactive and qualitative indices”, IEEE Transactions on System Man Cybernetics-Systems, 51(3), pp. 1855-1868 (2021). https://doi.org/10.1109/TSMC.2019.2906635