References:
1.Liu, S.W. and Wu, C.W. “Yield‐based variablesrepetitive group plan with a critical‐value‐adjustedmechanism”, Quality and Reliability EngineeringInternational, 38(6), pp. 3017-3032 (2022). https://doi.org/10.1002/qre.3004
2.Fernández, A.J. “Explicit lot inspection by attributesusing minimal prior information”, Computers andIndustrial Engineering, 148, 106743 (2020). https://doi.org/10.1016/j.cie.2020.106743
3.Mahmood, Y., Fatima, S., Khan, H., et al.“Acceptance sampling plans based on Topp-LeoneGompertz distribution”, Computers and IndustrialEngineering, 159, 107526 (2021). https://doi.org/10.1016/j.cie.2021.107526
4.Banihashemi, A., Fallah Nezhad, M.S., and Amiri,A. “A new approach in the economic design ofacceptance sampling plans based on process yieldindex and Taguchi loss function”, Computers andIndustrial Engineering, 159, 107155 (2021). https://doi.org/10.1016/j.cie.2021.107155
5.Yang, C.M. and Chen, K.S. “An integrated contractmanufacturer selection and product qualityoptimization methodology for the mechanicalmanufacturing industry. Expert Systems withApplications, 183, 115336 (2021). https://doi.org/10.1016/j.eswa.2021.115336
6.Lin, C. and Lin, P.Y. “A step-up approach forselecting substitute suppliers under nonlinearprofile data”, Quality Technology and QuantitativeManagement, 18(5), pp. 641–655 (2021). https://doi.org/10.1080/16843703.2021.1946738
7.Woodall, W.H. “Current research on profilemonitoring”, Production, 17(3), pp. 420-425 (2007). https://doi.org/10.1590/S010365132007000300002
8.Noorossana, R., Saghaei, A., and Amiri, A.,Statistical Analysis of Profile Monitoring, 865, JohnWiley and Sons (2011). https://doi.org/10.1002/9781118071984
9.Maleki, M.R., Amiri, A., and Castagliola, P. “Anoverview on recent profile monitoring papers (2008–2018) based on conceptual classification scheme”,Computers and Industrial Engineering, 126, pp. 705-728 (2018). https://doi.org/10.1016/j.cie.2018.10.008
10.Haq, A., Bibi, M., and Shah, B.A. “A novelapproach to monitor simple linear profiles usingindividual observations”, Communications inStatistics - Simulation and Computation, 51(11), pp.6269-6282 (2020). https://doi.org/10.1080/03610918.2020.1799229
11.Riaz, M., Mahmood, T., Abbas, N., et al. “Onimproved monitoring of linear profiles undermodified successive sampling”, Quality andReliability Engineering International, 35(7), pp.2202-2227 (2019). https://doi.org/10.1002/qre.2498
12.Ebadi, M. and Amiri, A. “Evaluation of processcapability in multivariate simple linear profiles”,Scientia Iranica, 19(6), pp. 1960–1968 (2012). https://doi.org/10.1016/j.scient.2012.09.010
13.Ebadi, M. and Shahriari, H. “A process capabilityindex for simple linear profile”, The International 64(5-8), pp. 857–865 (2013). https://doi.org/10.1007/s00170-012-4066-7
14.Keshteli, R.N., Kazemzadeh, R.B., Amiri, A., etal. “Developing functional process capabilityindices for simple linear profile”, Scientia Iranica,21(3), pp. 1044−1050 (2014).
15.Guevara, R.D., Vargas, J.A., and Castagliola, P.“Evaluation of process capability in non-linearprofiles using Hausdorff distance”, QualityTechnology and Quantitative Management, 13(1),pp. 1–15 (2016). https://doi.org/10.1080/16843703.2016.1139841
16.Ganji, Z.A. and Gildeh, B.S. “A new processcapability index for simple linear profile”,Published online in Communications in Statistics-Theory and Methods, 52(11), pp. 3879-3894 (2023). https://doi.org/10.1080/03610926.2021.1980804
17.Pakzad, A., Razavi, H., and Sadeghpour Gildeh, B.“Developing loss-based functional processcapability indices for simple linear profile”, Journalof Statistical Computation and Simulation, 92(1),pp. 115–144 (2022). https://doi.org/10.1080/00949655.2021.1933486.
18.Alevizakos, V., Koukouvinos, C., and Castagliola,P. “Process capability index for Poisson regressionprofile based on the Spmk index”, QualityEngineering, 31(3), pp. 430–438 (2019). https://doi.org/10.1080/08982112.2018.1523426
19.Guevara G, R.D. and Alejandra López, T. “Processcapability vector for multivariate nonlinear profiles”, Journal of Statistical Computation and Simulation, 92(6), pp. 1292–1321 (2022). https://doi.org/10.1080/00949655.2021.1991926
20.Wang, F.K. “A single sampling plan based onexponentially weighted moving average model for linear profiles”, Quality and Reliability Engineering International, 32(5), pp. 1795–1805 (2016). https://doi.org/10.1002/qre.1914
21.Wang, F.K. “The difference test statistic for twosuppliers with linear profiles”, Quality and Reliability Engineering International, 32(1), pp. 69-78 (2016). https://doi.org/10.1002/qre.1726
22. Aslam, M., Azam, M., and Jun, C.H. “Determinationof product acceptance for two suppliers with linearprofiles”, Scientia Iranica, 28(4), pp. 2333-2341(2021).https://doi.org/10.24200/sci.2020.51876.2408
23. Wang, F.K. “Variables sampling plan for resubmitted lots in a process with linear profiles”, Quality and ReliabilityEngineering International, 32(3), pp. 1029-1040 (2016).https://doi.org/10.1002/qre.1812
24.Aslam, M., Wang, F.K., Khan, N., et al. “A multipledependent state repetitive sampling plan for linear profiles”, Journal of the Operational Research Society, 69(3), pp. 467-473 (2018). https://doi.org/10.1057/s41274-017-0227-2.
25.Wang, F.K., Tamirat, Y., Lo, S.C., et al. “Dependentmixed and mixed repetitive sampling plans for linear profiles”, Quality and Reliability Engineering International, 33(8), pp. 1669-1683 (2017). https://doi.org/101002/qre.2134
26.Aslam, M. and Wang, F.K. “Acceptance samplingplans for linear profiles with one-sided specifications”, Journal of Statistical Computation and Simulation, 87(4), pp. 806-816 (2017). https://doi.org/10.1080/00949655.2016.1226311
27.Butt, K.A., Aslam, M., and Jun, C.H. “Analysis ofprocess yield in a cost-effective double acceptance sampling plan”, Communications in Statistics-Theory and Methods, 49(24), pp. 5975–5987 (2020). https://doi.org/10.1080/03610926.2019.1625922
28.Liu, S.W. and Wu, C.W. “A quick switchingsampling system by variables for controlling lot fraction nonconforming”, International Journal of Production Research, 54(6), pp. 1839-1849 (2016). https://doi.org/10.1080/00207543.2015.1084062
29.Wu, C.W., Liu, S.W., Chen, J.T., et al. “Design andconstruction of a variables switch-based sampling system for product acceptance determination”, The International Journal of Advanced Manufacturing Technology, 101(9-12), pp. 2643-2652 (2019). https://doi.org/10.1007/s00170-018-3147-7
30.Balamurali, S. and Usha, M. “Determination of anefficient variables sampling system based on the Taguchi process capability index”, Journal of the Operational Research Society, 70(3), pp. 420-432 (2019). https://doi.org/10.1080/01605682.2018.1441637
31.Wu, C.W., Lee, A.H., Liu, S.W., et al. “Capability-based quick switching sampling system for lot disposition”, Applied Mathematical Modelling, 52, pp. 131-144 (2017). https://doi.org/10.1016/j.apm.2017.07.050
32.Balamurali, S. and Usha, M. “Developing anddesigning of an efficient sampling system based on process capability index”, Journal of StatisticalComputation and Simulation, 87(7), pp. 1401–1415 (2017). https://doi.org/10.1080/00949655.2016.1267735
33.Banihashemi, A., Fallah Nezhad, M.S., and Amiri,A. “Developing process-yield-based acceptance sampling plans for AR (1) auto-correlated process”, Communications in Statistics-Simulation and Computation, 52(9), pp. 4230-4251 (2023). https://doi.org/10.1080/03610918.2021.1958845
34.Wang, Z.H., Wu, C.W., and Jhu, J.J. “Design andconstruction of a quick-switching sampling system with a third-generation capability index”, Communications in Statistics-Theory and Methods, 52(11), pp. 3633-3651 (2023). https://doi.org/10.1080/03610926.2021.1977959
35.Wang, Z.H. and Wu, C.W. “Design and constructionof a variables quick switching sampling system based on Taguchi capability index”, Computers and Industrial Engineering, 160, 107582 (2021). https://doi.org/10.1016/j.cie.2021.107582
36.Banihashemi, A., Fallah Nezhad, M. S., Amiri, A., etal. “Integrated QSS-RS plans based on the process yield index for lot acceptance determination”, Communications in Statistics-Theory and Methods, 52(23), pp. 8584-8606 (2023). https://doi.org/10.1080/03610926.2022.2065303
37.Wang, F.K. “A process yields for simple linearprofiles”, Quality Engineering, 26(3), pp. 311-318 (2014). https://doi.org/10.1080/08982112.2013.830739
38.Govindaraju, K. and Kuralmani, V. “Modified tablesfor the selection of QSS–1 quick switching system for a given (AQL, LQL)”, Communications in Statistics-Simulation and Computation, 21(4), pp. 1103-1123 (1992). https://doi.org/10.1080/03610919208813067
39.Soundararajan, V. and Arumainayagam, S.D.“Construction and selection of modified quick switching systems”, Journal of Applied Statistics, 17(1), pp. 83-114 (1990). https://doi.org/10.1080/757582650
40.Wu, C.W., Shu, M.H., and Liu, S.W. “A situationallysample‐size‐adjusted sampling scheme based on process yield verification”, Quality and Reliability Engineering International, 33(1), pp. 57-69 (2017). https://doi.org/10.1002/qre.1990
41.Amiri A., Zou, C., and Doroudyan, M.H.“Monitoring correlated profile and multivariate quality characteristics”, Quality and Reliability Engineering International, 30, pp. 133–142 (2014). https://doi.org/10.1002/qre.1483