Keywords = Heuristic
Number of Articles: 7
1. A Data Mining Based Solution Method for Flow Shop Scheduling Problems

Articles in Press, Accepted Manuscript, Available Online from 03 August 2020

Burcu Ozcan; Mesut Yavuz; Alpaslan Fıglalı


2. An improved model and a heuristic for capacitated lot sizing and scheduling in job shop problems

Volume 25, Issue 6, November and December 2018, Pages 3667-3684

O. Poursabzi; M. Mohammadi; B. Naderi


3. Single machine scheduling to minimize the maximum tardiness under piecewise linear deteriorating jobs

Volume 25, Issue 1, January and February 2018, Pages 370-385

Abbas-Ali Jafari; M. M. Lotfi


4. Train Timetabling on double track and multiple station capacity railway with useful upper and lower bounds

Volume 24, Issue 6, November and December 2017, Pages 3324-3344

Afshin Oroojlooy Jadid; Kourosh Eshghi


5. Decreasing the Crane Working Time in Retrieving the Containers from a Bay

Volume 24, Issue 1, February 2017, Pages 309-318

Esmaeel Azari; Hamidreza Eskandari; Amir Nourmohammadi


6. A heuristic approach for the sport equipment allocation and member recruiting management

Volume 22, Issue 4, August 2015, Pages 1534-1544

Peng Sheng You; Yung-Cheng Lee; Yi-Chih Hsieh