References
1. Guimar~aes, L., Klabjan, D., and Almada-Lobo, B.
Modelling lotsizing and scheduling problems with
sequence dependent set-ups", European Journal of
Operational Research, 239(3), pp. 644-662 (2014).
2. Fandel, G. and Stammen-Hegene, C. Simultaneous
lot sizing and scheduling for multi-product multilevel
production", International Journal of Production
Economic, 104(2), pp. 308-316 (2006).
3. Meyr, H. Simultaneous lotsizing and scheduling by
combining local search with dual reoptimization",
European Journal of Operation Research, 120(2), pp.
311-326 (2000).
4. Karimi, B., Fatemi-Ghomi, S.M.T., and Wilson, J.
The capacitated lot sizing problem: a review of
models and algorithms", Omega, 31, pp. 365-378
(2003).
5. Ouenniche, J. and Bertrand, J.W.M. The nite
horizon economic lot sizing problem in job shops:
the multiple cycle approach", International Journal of
Production Economics, 74, pp. 49-61 (2001).
6. Ouenniche, J., Boctor, F.F., and Martel, A. The
impact of sequencing decisions on multi-item lot sizing
and scheduling in
ow shops", International Journal
of Production Research, 10, pp. 2253-2270 (1999).
7. Maravelias, C.T. and Sung, C. Integration of production
planning and scheduling: Overview, challenges
and opportunities", Computers and Chemical Engineering,
33, pp. 1919-1930 (2009).
8. Karimi-Nasab, M. and Seyedhoseini, S.M. Multi-level
lot sizing and job shop scheduling with compressible
process times: A cutting plan approach", European
Journal of Operational Research, 231(3), pp. 598-616
(2013).
9. Stadtler, H. and Sahling, F. A lot-sizing and scheduling
model for multi-stage
ow lines with zero lead
times", European Journal of Operational Research,
225, pp. 404-419 (2013).
10. Babaei, M., Mohammadi, M., and Fatemi-Ghomi,
S.M.T. Lot sizing and scheduling in
ow shop with
sequence-dependent set-ups and backlogging", International
Journal of Computer Applications, 8, pp.
0975-8887 (2011).
11. Mohammadi, M., Fatemi-Ghomi, S.M.T., Karimi, B.,
and Torabi, S.A. MIP-based heuristics for lotsizing in
capacitated pure
ow shop with sequence-dependent
set-ups", International Journal of Production Research,
10, pp. 2957-2973 (2010).
12. Clark, A.R. and Clark, S.J. Rolling-horizon lot-sizing
when set-up times are sequence-dependent", International
Journal Production Research, 38(10), pp. 2287-
2308 (2000).
13. Mohammadi, M., Fatemi-Ghomi, S.M.T., Karimi, B.,
and Torabi, S.A. Rolling-horizon and x-and-relax
O. Poursabzi et al./Scientia Iranica, Transactions E: Industrial Engineering 25 (2018) 3667{3684 3683
heuristics for the multi-product multi-level capacitated
lot sizing problem with sequence-dependent set-ups",
J. Int. Manuf., 21, pp. 501-510 (2010).
14. Mohammadi, M., Fatemi-Ghomi, S.M.T., and Jafari,
J. A genetic algorithm for simultaneous lotsizing
and sequencing of the permutation
ow shops with
sequence-dependent set-ups", International Journal
of Computer Integrated Manufacturing, 1, pp. 87-93
(2011).
15. Mohammadi, M., Fatemi-Ghomi, S.M.T., Karimi, B.,
and Torabi, S.A. MIP-based heuristics for lotsizing in
capacitated pure
ow shop with sequence-dependent
set-ups", International Journal of Production Research,
10, pp. 2957-2973 (2010).
16. Mohammadi, M. and Jafari, N. A new mathematical
model for integrating lot sizing, loading, and scheduling
decisions in
exible
ow shops", International
Journal of Advanced Manufacturing Technology, 55,
pp. 709-721 (2011).
17. Ramezanian, R., Saidi-Mehrabad, M., and Teimoury,
E. A mathematical model for integrating lot-sizing
and scheduling problem in capacitated
ow shop environments",
International Journal of Advanced Manufacturing
Technology, pp. 347-361 (2013).
18. Ramezanian, R. and Saidi-Mehrabad, M. Hybrid simulated
annealing and MIP-based heuristics for stochastic
lot-sizing and scheduling problem in capacitated
multi-stage production system", Applied Mathematical
Modelling, 37(7), pp. 5134-5147 (2012).
19. Lasserre, J.B. An integrated model for job-shop planning
and scheduling", Management Science, 38(8), pp.
1201-1211 (1992).
20. Dauzere-Peres, S. and Lasserre, J.B. Integration of
lot sizing and scheduling decisions in a job-shop",
European Journal of Operational Research, 75, pp.
413-426 (1994).
21. Lalitha, J.L., Mohan, N., and Pillai, V.M. Lot streaming
in [N 1](1) + N(m) hybrid
ow shop", Journal
of Manufacturing Systems, 44, pp. 12-21 (2017).
22. Giglio, D., Paolucci, M., and Roshani, A. Integrated
lot sizing and energy-ecient job shop scheduling
problem in manufacturing/remanufacturing systems",
Journal of Cleaner Production, 148, pp. 624-641
(2017).
23. Wolosewicza, C., Dauzere-Peresa, S., and Aggouneb,
R. A Lagrangian heuristic for an integrated lot-sizing
and xed scheduling problem", European Journal of
Operational Research, 000, pp. 1-10 (2015).
24. Karimi-Nasab, M., Modarres, M., and Seyedhoseini,
S.M. A self-adaptive PSO for joint lot sizing and
job shop scheduling with compressible process times",
Applied Soft Computing, 27, pp. 137-147 (2015).
25. Karimi-Nasab, M., Modarres, M., and Seyedhoseini,
S.M. Lot sizing and job shop scheduling with compressible
process times: A cut and branch approach",
Computer and Industrial Engineering, 85, pp. 196-205
(2015).
26. Urrutia, E.D.G., Aggoune, R., and Dauzere-Peres,
S. Solving the integrated lot-sizing and job-shop
scheduling problem", International Journal of Production
Research, 52(17), pp. 5236-5254 (2014). DOI:
10.1080/00207543.2014.902156
27. Mateus, G.R., Ravetti, M.G., de Souza, M.C., and
Valeriano, T.M. Capacitated lot sizing and sequence
dependent set-up scheduling: an iterative approach for
integration", Journal of Scheduling, 13, pp. 245-259
(2010). DOI 10.1007/s10951-009-0156-2
28. Zhang, X.D. and Yan, H.S. Integrated optimization
of production planning and scheduling for a kind of
job-shop", International Journal of Advanced Manufacturing
Technology, 26, pp. 876-886 (2005). DOI
10.1007/s00170-003-2042-y
29. Ouenniche, J. and Boctor, F. Sequencing. Lot sizing
and scheduling of several products in job shop: the
common cycle approach", International Journal of
Production Research, 36(4), pp. 1125-1140 (1998).
30. Shim, I.S., Kim, H.C., Doh, H.H., and Lee, D.H. A
two-stage heuristic for single machine capacitated lotsizing
and scheduling with sequence-dependent set-up
costs", Computers & Industrial Engineering, 61, pp.
920-929 (2011).
31. Afentakis, P. and Gavish, P. Optimal lot-sizing algorithms
for complex product structures", Operation
Research, 34, pp. 237-249 (1986).
32. Franca, P.M., Armentano, V., Berretta, R.E., and
Clarc, A.R. A heuristic method for lot-sizing in multistage
systems", Computers and Operations Research,
24(9), pp. 861-874 (1997).
33. Xie, J. and Dong, J. Heuristic genetic algorithms
for general capacitated lot-sizing problem", Computer
and Mathematics with Applications, pp. 44263-44276
(2001).
34. Mohammadi, M. and Poursabzi, O. A rolling horizonbased
heuristic to solve a multi-level general lot sizing
and scheduling problem with multiple machines
(MLGLSP MM) in job shop manufacturing system",
Uncertain Supply Chain Management, 2, pp. 167-178
(2014).