Author = Fariborz Jolai
Number of Articles: 7
1. A novel fuzzy bi-objective vehicle routing and scheduling problem with time window constraint for a distribution system: A case study

Articles in Press, Accepted Manuscript, Available Online from 19 February 2020

Ayda Esmaeili-Douki; Mahdi Mahzouni-Sani; Abbas Nikhalat Jahromi; Fariborz Jolai


3. Integrated Forward-reverse Logistics Network Design under Uncertainty and Reliability Consideration

Volume 23, Issue 2, April 2016, Pages 721-735

S. M. Hatefi; F. Jolai; S.A. Torabi; R. Tavakkoli-Moghaddam


4. An Evolutionary Algorithm for Supplier Order Allocation with Fuzzy Parameters Considering Linear and Volume Discount

Volume 22, Issue 3, June 2015, Pages 1130-1141

Mahsa Soufi Neyestani; Fariborz Jolai; Hamid Reza Golmakani


5. An enhanced invasive weed optimization for makespan minimization in a flexible flowshop scheduling problem

Volume 21, Issue 3, June 2014, Pages 1007-1020

Fariborz Jolai; Reza Tavakkoli-Moghaddam; M. Rabiee; E. Gheisariha


6. Consideration of transportation lags in Two-machine Flowshop scheduling problem

Volume 20, Issue 6, December 2013, Pages 2215-2223

Fariborz Jolai; Hamid Abedinnia


7. Three meta-heuristics to solve the no-wait two-stage assembly flow shop scheduling problem

Volume 20, Issue 6, December 2013, Pages 2275-2283

A. Mozdgir; S.M.T. Fatemi Ghomi; F. Jolai; J. Navaei