Volume & Issue: Volume 26, Issue 3, Transactions on Industrial Engineering (E), May and June 2019, Pages 1763-1924 
5. The surgical case scheduling problem with fuzzy duration time: An ant system algorithm

Pages 1824-1841

Reza Behmanesh; Mostafa Zandieh; Seyyed Mohammad Hadji Molana


8. Robust and sustainable full-shipload routing and scheduling problem considering variable speed: A real case study

Pages 1881-1897

Masoud Rabbani; Shohre Sadeghsa; Maliheh Vaez-Alaei; Hamed Farrokhi-Asl


10. Modeling stock-out loss and overstocking loss generated by bullwhip effect

Pages 1913-1924

M. Zanddizari; R. Tavakkoli-Moghaddam; A. Azaron


Journal Archive

Transactions on Civil Engineering (A) Transactions on Mechanical Engineering (B) Transactions on Industrial Engineering (E) Transactions on Civil Engineering (A) Transactions on Mechanical Engineering (B) Transactions on Industrial Engineering (E) Transactions on Civil Engineering (A) Transactions on Mechanical Engineering (B) Transactions on Chemistry and Chemical Engineering (C) Transactions on Computer Science & Engineering and Electrical Engineering (D) Transactions on Industrial Engineering (E) Transactions on Nanotechnology (F) Transactions on Civil Engineering (A) Transactions on Mechanical Engineering (B) Transactions on Industrial Engineering (E) Transactions on Civil Engineering (A) Transactions on Mechanical Engineering (B) Transactions on Industrial Engineering (E)