Hybrid fuzzy-stochastic approach for multi-product, multi-period, and multi-resource master production scheduling problem: case of a polyethylene pipe and fitting manufacturer
Articles in Press, Accepted Manuscript , Available Online from 25 April 2018
Redundancy allocation problem with a mixed strategy for a system with k-out-of-n subsystems and time-dependent failure rates based on Weibull distribution: An optimization via simulation approach
Articles in Press, Accepted Manuscript , Available Online from 27 January 2018
Pedram Pourkarim Guilani; Parham Azimi; Mani Sharifi; Maghsoud Amiri
An Imperfect Multi-Item Single Machine production system with Shortage, Rework, and Scrapped Considering Inspection, Dissimilar Deficiency Levels, and Non-Zero Setup Times
Articles in Press, Accepted Manuscript , Available Online from 07 January 2018
Amir Hossein Nobil; Amir Hosein Afshar Sedigh; Sunil Tiwari; Hui Ming Wee