Keywords = Lower bound
Capacitated lot-sizing and production sequence problem with setups complexity

Articles in Press, Accepted Manuscript, Available Online from 23 January 2022

J. Behnamian; S.M.T. Fatemi Ghomi; B. Karimi; M. Fadaei Moludi


A lower bound on the stretch factor of Yao graph Y4

Volume 29, Issue 6, November and December 2022, Pages 3244-3248

D. Bakhshesh; M. Farshi


Multi-robot exploration on grids with a bounded time

Volume 28, Special issue on collective behavior of nonlinear dynamical networks, June 2021, Pages 1515-1528

M. Davoodi; E. Delfaraz; S. Ghobadi; M. Masoori


The stage shop scheduling problem: lower bound and metaheuristic

Volume 27, Issue 2, March and April 2020, Pages 862-879

M.M. Nasiri; M. Hamid


An improved model and a heuristic for capacitated lot sizing and scheduling in job shop problems

Volume 25, Issue 6, November and December 2018, Pages 3667-3684

O. Poursabzi; M. Mohammadi; B. Naderi


Adaptive mesh-free lower bound limit analysis using non-linear programming

Volume 24, Issue 6, November and December 2017, Pages 2793-2802

Seyed Mohammad Binesh; S. Rasekh