A master production schedule warning approach for cement equipment manufacturing enterprises

Authors

1 School of Mechanic and Electronic Engineering, Wuhan University of Technology, Wuhan, 430070, China.

2 School of Mechanic and Electronic Engineering, Wuhan University of Technology, Wuhan, 430070, China

Abstract

Reducing product delivery time is a key factor for enterprises in increasing their core competitiveness. In order to resolve problems, including lack of a warning and monitoring system for Master Production Schedules (MPS) in cement equipment manufacturing enterprises, we propose a warning  echanism based on theoretical nish percentage and actual nish percentage. First, an MPS model, based on the product Manufacturing Bill Of the Material (MBOM), is proposed. Second, we present an approach for generating planned time, actual time, actual nish percentage and theoretical nish percentage, and yellow and red warnings are introduced to evaluate whether the production plan is normal or not. Finally, we use an example to illustrate the proposed algorithm process. Experimental results have shown that the proposed approach is able to support MPS warning.

Keywords