<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Sharif University of Technology</PublisherName>
				<JournalTitle>Scientia Iranica</JournalTitle>
				<Issn>1026-3098</Issn>
				<Volume>17</Volume>
				<Issue>2</Issue>
				<PubDate PubStatus="epublish">
					<Year>2010</Year>
					<Month>12</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Determination of the Number of Kanbans and Batch Sizes in a JIT Supply Chain System</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage></FirstPage>
			<LastPage></LastPage>
			<ELocationID EIdType="pii">3363</ELocationID>
			
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>S.K.</FirstName>
					<LastName>Chaharsooghi</LastName>
<Affiliation>Department of Industrial Engineering,Tarbiat Modares University</Affiliation>

</Author>
<Author>
					<FirstName>A.</FirstName>
					<LastName>Sajedinejad</LastName>
<Affiliation>Department of Industrial Engineering,Tarbiat Modares University</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2011</Year>
					<Month>01</Month>
					<Day>03</Day>
				</PubDate>
			</History>
		    <Abstract>Under stochastic demand in the multi-stage SCM in a JIT environment, the probability
of generating a function of the stationary distributions of the backlogged demand was extended. The
batch size of WIPs has a great impact on the packing, unpacking or transferring costs of a chain; it
has been attempted to integrate the delivery batch size of each plant in a multi-stage serial chain with
the production-ordering and supplier kanbans of the chain. An algorithm was developed to evaluate the
optimal numbers of kanbans and batch sizes of each plant by minimizing the total cost of a chain. A
numerical example is also provided to indicate the signicance of adding the proposed assumptions, as
well as demonstrating the approach adopted towards solving the problem.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Supply chain</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">JIT</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Stochastic demand</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Batch size</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Kanban</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://scientiairanica.sharif.edu/article_3363_664dd858db942cad06f24ff25df56716.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
