<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Sharif University of Technology</PublisherName>
				<JournalTitle>Scientia Iranica</JournalTitle>
				<Issn>1026-3098</Issn>
				<Volume>15</Volume>
				<Issue>6</Issue>
				<PubDate PubStatus="epublish">
					<Year>2008</Year>
					<Month>12</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Genetic Algorithm Based Fuzzy Multi-Objective Approach to FACTS Devices Allocation in FARS Regional Electric Network</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage></FirstPage>
			<LastPage></LastPage>
			<ELocationID EIdType="pii">3086</ELocationID>
			
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>M.</FirstName>
					<LastName>Kalantar</LastName>
<Affiliation>Department of Electrical Engineering,Iran University of Science and Technology</Affiliation>

</Author>
<Author>
					<FirstName>M.</FirstName>
					<LastName>Gitizadeh</LastName>
<Affiliation>Department of Electrical Engineering,Iran University of Science and Technology</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2009</Year>
					<Month>07</Month>
					<Day>25</Day>
				</PubDate>
			</History>
		    <Abstract>In this investigation, a novel approach is presented to nd the optimum locations and capacity
of Flexible AC Transmission Systems (FACTS) devices in a power system using a fuzzy
multi-objective function. Maximising the fuzzy satisfaction allows the optimization algorithm
to simultaneously consider the multiple objectives of the network to obtain active power loss
reduction; i.e., new FACTS devices cost reduction, robustifying the security margin against
voltage collapse, network loadability enhancement and a voltage deviation reduction of the
power system. A Genetic Algorithm (GA) optimization technique is then implemented to
solve the fuzzy multi-objective problem. Operational and control constraints, as well as load
constraints, are considered for optimum device allocation. Also, an estimated annual load prole
has been utilized in a Sequential Quadratic Programming (SQP) optimization sub-problem to
nd the optimum location and capacity of FACTS devices, accurately. A Thyristor Controlled
Series Compensator (TCSC) and a Static Var Compensator (SVC) are utilized as series and
shunt FACTS devices in this study. The Fars regional electric network is selected as a practical
system to validate the performance and eectiveness of the proposed method.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">FACTS devices allocation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">multi-objective optimization</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Genetic Algorithm</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">fuzzy</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://scientiairanica.sharif.edu/article_3086_a081cab429ff7a3b96e0a07319f1049e.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
