<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Sharif University of Technology</PublisherName>
				<JournalTitle>Scientia Iranica</JournalTitle>
				<Issn>1026-3098</Issn>
				<Volume>28</Volume>
				<Issue>5</Issue>
				<PubDate PubStatus="epublish">
					<Year>2021</Year>
					<Month>10</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Numerical analysis and back calculation for embankment dam based on monitoring results (Case study: Iran-Lurestan Rudbar)</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>2519</FirstPage>
			<LastPage>2533</LastPage>
			<ELocationID EIdType="pii">22254</ELocationID>
			
<ELocationID EIdType="doi">10.24200/sci.2021.56159.4579</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>V.</FirstName>
					<LastName>Ghiasi</LastName>
<Affiliation>Department of Civil Engineering, University of Malayer, Hamadan, P.O. Box 65719-95863, Iran</Affiliation>
<Identifier Source="ORCID">0000-0002-4192-8097</Identifier>

</Author>
<Author>
					<FirstName>F.</FirstName>
					<LastName>Heydari</LastName>
<Affiliation>Department of Civil Engineering, University of Malayer, Hamadan, P.O. Box 65719-95863, Iran</Affiliation>

</Author>
<Author>
					<FirstName>H.</FirstName>
					<LastName>Behzadinezhad</LastName>
<Affiliation>Department of Mining Engineering, Isfahan University of Technology, Isfahan, Iran</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2020</Year>
					<Month>06</Month>
					<Day>11</Day>
				</PubDate>
			</History>
		<Abstract>In this paper, comparing the results obtained from monitoring and numerical modeling carried out to significantly help to analyze the stability of embankment dams. comparison of these analyses with the fact they are the precise instrument results, in addition to validating the numerical analysis, is the basis for performing a back analysis to obtain accurate Geotechnical parameters. Accordingly, the final parameters extracted by the back calculation method of materials in the body of earth dams to predict dam performance are the main purpose of this study. In this study, the Rudbar Lurestan dam was selected as a case study and the results of its instrumentation were processed and analyzed. Then, the monitoring results of one of the sections (C5-C5), were selected for analysis and comparison with the numerical model. At first, the model was modeled in a static state at the time of construction. FLAC2D V7 software was used for modeling and simulation was done using Mohr-Coulomb behavioral model and the initial parameters of the material. The observations show that there is a good agreement between the monitoring results of the modeling and also final parameters obtained from the back calculation show a growing trend in most parameters.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Back Calculation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Monitoring</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Instrumentation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">FLAC 2D</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Rudbar Rock fill Dam</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://scientiairanica.sharif.edu/article_22254_8709c68806a55ca2b12db80514b8e3c8.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
