<ArticleTitle>Risk-based switch placement in electric distribution network in the presence of performance-based regulation</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>3492</FirstPage>
			<LastPage>3503</LastPage>
			<ELocationID EIdType="pii">21406</ELocationID>
			
<ELocationID EIdType="doi">10.24200/sci.2019.51470.2213</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>M.</FirstName>
					<LastName>Simab</LastName>
<Affiliation>Department of Electrical Engineering, Marvdasht Branch, Islamic Azad University, Marvdasht, Iran</Affiliation>

</Author>
<Author>
					<FirstName>A.</FirstName>
					<LastName>Moradkhani</LastName>
<Affiliation>Department of Electrical Engineering, Faculty of Engineering, Ilam University, Ilam, Iran</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2018</Year>
					<Month>10</Month>
					<Day>08</Day>
				</PubDate>
			</History>
		<Abstract>A reward and penalty scheme (RPS) is used for setting up the service quality which exposes the distribution companies to financial benefits caused by demand for the reliability of customers. In this paper, an algorithm for the optimal switch number and placement in distribution networks in the presence of RPS is presented. The primary objective is reliability improvement and minimization of the cost of sectionalizing switches (SS) and tie switches (TS) for a given regulatory period considering acceptable financial risk. In this algorithm, the uncertainty in the reliability is appeared as financial risk. A genetic algorithm is adopted to solve the optimization problem. The number and location of SS and TS is found while financial incentives of RPS, capital investment and annual operation and maintenance costs are considered. The performance of the proposed approach is assessed and illustrated on a real distribution network. The results show the efﬁciency of the proposed algorithm.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Distribution networks regulation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">performance based regulation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">power system reliability</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">reward and penalty scheme</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">switch placement</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://scientiairanica.sharif.edu/article_21406_1b6d1b2b7c8ad1293b3a1b329ed55579.pdf</ArchiveCopySource>
</Article>
</ArticleSet>