<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>Sharif University of Technology</PublisherName>
				<JournalTitle>Scientia Iranica</JournalTitle>
				<Issn>1026-3098</Issn>
				<Volume>26</Volume>
				<Issue>3</Issue>
				<PubDate PubStatus="epublish">
					<Year>2019</Year>
					<Month>06</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>A queuing theory-based approach to designing cellular manufacturing systems</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>1865</FirstPage>
			<LastPage>1880</LastPage>
			<ELocationID EIdType="pii">20425</ELocationID>
			
<ELocationID EIdType="doi">10.24200/sci.2018.5020.1047</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>K.</FirstName>
					<LastName>Forghani</LastName>
<Affiliation>Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran</Affiliation>
<Identifier Source="ORCID">0000-0003-3040-261X</Identifier>

</Author>
<Author>
					<FirstName>S.M.T.</FirstName>
					<LastName>Fatemi Ghomi</LastName>
<Affiliation>Department of Industrial Engineering, Amirkabir University of Technology,424 Hafez Avenue,Tehran,Iran</Affiliation>
<Identifier Source="ORCID">0000-0003-4363-994X</Identifier>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2017</Year>
					<Month>08</Month>
					<Day>15</Day>
				</PubDate>
			</History>
		<Abstract>This paper presents a new cell formation and cell layout problem considering multiple process routings and subcontracting using the principles of queuing theory. It is assumed that each machine operates as an M/M/1 queuing system and a queuing network is used to obtain in-process inventories and machine utilization. The problem is formulated as a mixed-integer nonlinear program with the objective of minimizing the total costs, including the production, subcontracting, material handling, machine idleness, and holding costs. Due to the computational complexity of the problem, a heuristic method is suggested to effectively solve the problem. A numerical example is given to clarify the proposed approach, and finally, further instances are solved to verify the performance of the solution method and to accomplish comparisons. The computational results show that the proposed heuristic is both effective and efficient.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">cell formation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">facility layout</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">queueing network</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">routing</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">outsourcing</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">heuristic method</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://scientiairanica.sharif.edu/article_20425_6e40bb76aed065932b7314cf7ea9629b.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
